Outcome. A deal owner gets a check-in task at the halfway point of any multi-year renewal contract, so a two- or three-year deal does not go silent between signature and its eventual renewal date.
flowchart TD
A[Deal Closed Won, term 24+ months, check-in not completed] --> B[Calculate and set Mid-term Check-in Date]
B --> C[Wait until check-in date]
C --> D{Check-in already completed?}
D -->|No| E[Create task for deal owner]
E --> F[Notify deal owner]
D -->|Yes| G[No action]

When to use it, when not to
- UseUse it on any Closed Won renewal or new-business deal with a contract term of 24 months or longer.
- UseUse it as a lightweight relationship touchpoint, separate from the executive business review cadence in renewal-expansion-024, which targets the period right before renewal rather than the middle of the term.
- SkipDo not use it on month-to-month or annual contracts. A 12-month or shorter term does not need a mid-term milestone; renewal-expansion-002's reminder cascade already covers the run-up to those renewals.
- SkipDo not use it if
Contract Term Monthsis not populated on the deal; there is no midpoint to calculate without it.
or the renewal and expansion pack, 39 EUR
One-time, excl. VAT. 30-day refund, no questions asked. Founding prices until 31 October, then 199 and 59 EUR. Includes every spec added later, up to the full 500, and the one-click installer on the full library. Building on client portals? The agency licence at 449 EUR covers unlimited client portals.





