Days-in-current-stage property tracker
One of 565 written HubSpot workflow specs, by a collective of independent HubSpot consultants.
Professional
Seat pricing: Professional edition. To build it, a GTM Seat or an Ops Seat (an Ops Seat cannot create marketing emails or sequences). Per-hub plans: Sales Hub Professional.
OutcomeEvery deal carries a single, always-current "date entered current stage" property, so a report or list filter can flag deals sitting too long in whatever stage they are in, without checking one property per stage.
Workflow mapdeal-hygiene-021
When to use it, when not to
Use it
- Use it when the native per-stage properties, a separate date-entered and time-in-stage pair for every stage, make list building and reporting cumbersome, because you would need to check all of them to catch "any stage, too long."
- Use it as the property foundation other fiches build alerts on top of, see deal-hygiene-006 for a per-stage wait-until nudge, and deal-hygiene-020 for regression detection.
Read more on when to use itShow less
Skip it
- Do not use it expecting a live, constantly-incrementing "days in stage" number. HubSpot workflows do not run on a timer that updates a number every day on their own. This fiche stores a date and lets a report or list filter compute the elapsed time relative to today.
- Do not duplicate the native per-stage properties if your reporting already reads them fine. Check what already exists before building.
Read more on when to skip itShow less
The rest of this spec
Not the workflow you needed?
Read 12 complete specs before you pay.
One per category, same format as the paid ones. Email only, no card.
We email the link, then a short note when specs change. Nothing else.
Here it is. Download the pack now (.zip) The link is in your inbox too.
Read the free Deal hygiene spec